NHS District General Hospital
- Full BMS Installation (Niagara 4)
- Fire Alarm Integration (BACnet)
- 46 AHU Controls
- Theatre Pressurisation
- Energy Sub-Metering (12 Depts)
- 24/7 Remote Monitoring
A major NHS District General Hospital with over 800 beds required a complete BMS overhaul to meet NHS net-zero targets and improve fire system integration. Legacy systems from multiple manufacturers with no unified monitoring left the estates team reacting to failures rather than preventing them.
Odin delivered a full Niagara 4-based BMS integrating 46 AHUs, theatre pressurisation controls, fire damper monitoring and full energy sub-metering. Monthly energy reports provided to the estates team identify consumption trends and support the trust's net-zero reporting.