NHS District General Hospital
- Full BMS Installation (Niagara 4)
- Fire Alarm Panel Integration (BACnet)
- 46 AHU Controls & Sequencing
- Theatre Pressurisation Control
- Energy Sub-Metering (12 Departments)
- 24/7 Remote Monitoring
- 5-Year PPM Contract
A major NHS District General Hospital with over 800 beds required a complete BMS overhaul to meet NHS net-zero targets and improve fire system integration. Legacy systems from multiple manufacturers with no unified monitoring left the estates team reacting to failures rather than preventing them.
Odin delivered a full Niagara 4-based BMS integrating 46 AHUs, theatre pressurisation controls, fire damper monitoring and full energy sub-metering across 12 departments. The system interfaces with the existing Gent fire alarm panel via BACnet — enabling automated HVAC shutdown sequences on alarm activation. Detailed energy reports provided to the estates team monthly, identifying consumption trends and supporting the trust's net-zero reporting.